Ashuelot River Study
The protected instream flow study of the Ashuelot River began in 2021 and fieldwork was completed in 2022. The draft Protected Instream Flow Study Report is estimated to be ready for public review and release in Summer 2024 and the draft Water Management Plan for the Ashuelot River will be developed thereafter. Please watch this space for notifications.
Real Time Water Data