Proposing to Create a New Public Water System
The purpose of this document is to identify factors that are important
when proposing to create a new public water system. Where town water service
is needed, DES recommends extending an existing nearby municipal water
system, wherever possible, rather than building a "stand-alone" system.
The extension option is typically much less costly and is operationally
much more efficient. In many cases however, such an option is not available.
Principal Activities in Creating a District
In recent years most new governmental water systems in New Hampshire
have been established as separate water districts or precincts rather than
a direct component of town government. See Chapter RSA 52 for detailed
procedures for establishing districts. Typical activities in forming a
district include:
-
Ten or more voters petition the selectmen to establish a district for providing
pubic water service.
-
Selectmen, possibly with the assistance of a local committee, prepare a
plan showing possible district boundaries.
-
Public meetings are held to receive comment on tentative boundaries and
the wording of the proposed warrant articles.
-
After appropriate notice and hearings, a formal vote is taken to see if
the district will be established.
Duration and Schedule of Activities
The water system project could take 3-4 years from concept discussion
to system start-up assuming ownership by a district or town. If owned by
a city or private regulated utility the time-frame should be less. Shown
below is a brief summary of the process and sequence of the activities
that could take place during this period.
Initial Action. Identify the needs or special benefits that a
public water system would provide. Develop a cadre of supporters, prepare
proposed warrant articles and boundary maps to be presented at the town
meeting. This would take up most of the first year.
Organization. Assuming the district is created, the district
Board of Commissioners would likely schedule a meeting soon thereafter.
At that time the voters of only the district will need to select a district
name, develop procedural rules, retain clerical, accounting and technical
support, appropriate funds to allow the district to function and authorize
a preliminary engineering study of the proposed water system. This would
begin the second year of activity.
Final Planning. Assuming completion of the engineering study,
the Board would likely return to the voters seeking approval of the water
system concept of the initial service area, and appropriations to fund
final engineering design, further testing of well sites, and possible land
acquisition. This would begin the third year of activity.
Construction. At the beginning of the fourth year, the Board
would seek appropriations from the voters for construction funds. In addition
the Board would seek funding to provide for initial start-up operations.
Operation. Initial operations of the water system would typically
have just begun at the beginning of the fifth year.
Identifying The Level of Service to be Offered
A public water system can provide two levels of service:
-
domestic water service only, or
-
domestic water service and fire protection flow capability
In order to develop a reliable cost estimate, for engineering, construction
and operation, the level of service will need to be identified early in
the process.
The offering of fire protection flows greatly increases the physical
size of each component of the system and subsequently increases the
construction cost by 5-10 times that of a system without fire flow
capability.
Some components of a water system (e.g., sources and water storage tanks)
may be initially constructed at a small size to minimize cost. However,
if fire flows are ultimately planned, the distribution system piping must
be installed at the proper size from the very beginning of the system's
construction.
Identify The Area Which Would be Initially Served
In order to estimate the overall cost of developing a system and the
per user cost, the area of initial service must be defined. Considerations
when defining this service boundary include: a relatively compact area;
low elevations relative to the elevation of the water storage tank; similar
needs or similar motivation of proposed users such as addressing poor water
quality or providing fire flows.
Defining How The Capital Cost will be Repaid
The Board of Commissioners or voters will need to determine how the
bond repayment will be made. Critical decisions include: determining the
portion of cost to be paid by industry or commerce and the method of apportioning
the remaining cost among users. Typical apportionment methods include:
betterment assessments using lot frontage, real estate assessment value,
or exclusively by water use charges. Typical rate categories include: availability,
fire flow service (hydrant rental), rates for minimal use and rates for
normal usage. There are many reference books in this area that you can
borrow.
Administrative Organization of a New District
The most recent districts established in New Hampshire are: Northwood
Ridge in Northwood, Swain's Lake in Barrington, and Lochmere in Tilton.
You may wish to contact these systems to obtain first hand knowledge of
the legal, political, operational and public education aspects of establishing
a district. We can provide contact information for these and other water
systems.
Development of a Water System by the Private Sector
It is possible that one of the large, privately owned, water utilities
in New Hampshire would be interested in developing, owning and operating
a water system to serve your area. If that were to occur, their service
fees and the area for which that they would receive a "franchise" would
be regulated by the New Hampshire Public Utilities Commission. This is
the same agency that regulates telephone, natural gas, and electric rates
in New Hampshire. They can be contacted at 271-2431.
It is not likely that such a utility would invest in an area of sparse
population with little potential for future residential or commercial growth.
The major stockholder utilities in New Hampshire include:
| Company |
Current Operating Locations |
| Hampton Water Works Co |
Hampton, NH and Salisbury, MA |
| Integrated Water Co |
Barnstead and other areas |
| Pennichuck Water Co |
Nashua and other southern NH areas |
| Consumers - NH Water Co |
Hudson and other southern NH areas |
Possible Sources of Funding
There are at least two government entities that might be able to offer
financial aid to municipally owned water systems. This aid is typically
predicated on the level of financial need that the proposed service area
can document. This documentation is typically based on an income survey
of the proposed users. You are welcome to contact these funding agencies
directly.
| Farmer's Home Administration |
Community Development Block Grant |
| 501 South Street |
Office of State Planning |
| Concord, NH 03301 |
2.5 Beacon Street |
| 226-9331 |
Concord, NH 03301
271-2155 |
Anticipated Benefits of a Public Water System
-
Lower fire insurance premiums maybe expected, particularly for large industrial,
commercial or governmental buildings. This can often be an inducement to
industry to help fund the capital costs of such a water system. Contact
your insurance underwriter to determine the amount of savings that would
be realized.
-
The availability of "off lot" water greatly simplifies the task of replacing
a failed leach field or developing a lot since the setback requirements
from wells no longer apply. A typical budget estimate for a new private
well and pump is approximately $4,000.
-
There are a variety of natural and manmade water quality problems seen
in private wells in "built up" areas of NH. These include salt, bacteria,
oil spills, mineral radioactivity, radon, arsenic, fluoride, hardness,
iron/manganese and corrosivity. These issues can be avoided with central
water system.
-
Many wells have inadequate capacity, or "go dry" with the passage of time.
A central system, avoid this problem.
Assistance from DES
DES would be pleased to help you evaluate your initial concept for a
new water system. However, a consulting engineer would need to be hired
after the district is formed to determine an accurate cost estimate and
develop a detailed preliminary design. The agency maintains a roster of
pre-qualified engineers in New Hampshire that are well versed in water
system design.
TECHNICAL AND COST CONSIDERATION
The remainder of this document offers comments on how a water system
is designed, how it functions and what are typical construction costs of
water system facilities. This information is given so that a realistic
understanding of the cost of water works construction can be gained. These
cost estimates are for illustrating the magnitude of the possible costs
but
can not be used for estimating needed appropriations or actual construction
costs for a particular area.
Components of a Water System
A water system has three principal components as shown below. The ability
to develop these facilities at reasonable cost is based on site specific
conditions such as topography and geology of the service area.
Supply source(s)
Storage tank(s) and
A system of pipes to convey the water from its source to where it will
be used.
Sources of Water Supply
The essence of any water system is it source(s). A surface water supply
(such as lake or river) is typically not feasible for a "start-from-scratch"
system due to the very high capital and operational cost of the required
full treatment plant.
Normally water would be supplied from one or more gravel packed or bedrock
wells.
Multiple sources are typically required to provide reliability. Such sources
are not located at random but rather require the application of many technical
methods to ensure the highest productivity and safest location. Gravel
wells are typically located in areas of low elevation often near a river
or pond in gravel aquifer area. A "test well" program is necessary to determine
the most favorable locations for water supply wells.
Bedrock wells can be located in a wider variety of areas however, their
output on average, is lower and their pumping cost are much higher. The
expected output of a bedrock well can be improved by use of a scientific
concept called "fracture trace analysis."
A budget estimate for a water supply well of 150 gallons per minute
(gpm) and assuming purchase of sufficient protective land to meet regulatory
requirements would cost in the magnitude of $200,000. The required pump
station would be an additional cost.
A 25 gpm bedrock well for a very small water system with no fire protection
with required land purchase could cost approximately $50,000. The pump
station and storage tank(s) for the small system would be an additional
cost.
Distribution Piping System
It will be necessary to identify the area to be served so that the cost
of the distribution system can be estimated.
The distribution system must be buried to prevent freezing and to prevent
damage from highway vehicles. The burial depth for New Hampshire is a minimum
of five feet. The layout for the piping should be arranged to minimize
dead ends and provide redundancy of piping over obstacles such as rivers,
limited access highways and railroads etc. The cost of pipe installation
will be lowest where there are sandy excavation conditions, little conflict
with other utilities and where traffic safety issues are low. Piping cost
will increase where bedrock is high, peat removal is necessary, water tables
are high, and where existing pavement must be replaced or repaired.
A preliminary budget estimate for distribution piping, assuming an 8"
diameter main, with little ledge excavation, and with on-line valves and
hydrants and pavement replacement would be approximately $50 per lineal
foot. Assuming a water system with an initial 5,000 linear feet of piping,
the preliminary cost estimate for distribution system would be $250,000.
For very small distributions systems with no fire protection and gravel
roads a $20 per foot cost for piping is reasonable.
In addition, each home would need to be connected to the arterial pipe
in the street. A budget estimate, for 75 feet of 3/4 inch tubing and a
water meter and backflow preventer, per home, would be approximately $800.
Storage Tanks
For systems with fire flow, one or more large storage tank(s) are necessary.
These tanks are normally located on a hillside or hilltop so that there
is "gravity" flow during high usage periods. Such high usage situations
include pipe breaks, fires flows, system flushing and mechanical or electrical
failure. Such high elevations normally have high land costs and limited
availability. A budget estimate for a 250,000 gallon water storage tank
and purchase of hilltop land would be approximately $250,000.
For very small systems with no fire protection; the storage tank would
typically located near the well at a low elevation. A cost of $20,000 is
a reasonable estimate for such tankage.
For More Information
In summary, DES generally supports the benefits of having a Public Water
System and can provide insights in the initial conceptualization of the
proposal. For more information please call the DES's Water Supply Engineering
Bureau at 271-3139. We would appreciate your comments concerning this fact
sheet.
|