The Souhegan River Flood Control Sites of New Ipswich, NH
Creation of the Flood Control Sites
During the early 1960s, the provisions of Public Law 566, the Watershed
Protection and Flood Prevention Act, were being implemented in New Hampshire.
This initiative, which was in large part influenced by occurrences of repetitive
flooding and the large floods of 1936 and 1938, was intended to provide
the means to study the hydrology of the watershed and the hydraulics of
the Souhegan River and its tributaries and to follow-up by constructing
strategically located flood control sites. Four of the twelve sites were
constructed in the Town of New Ipswich. They are Sites 13,
14, 19, and 35, and all are currently owned and operated
by the N.H. Department of Environmental Services (DES).
Although many federal, state, and local sponsors played roles in the
planning and execution of these projects, the U.S. Department of Agriculture
(USDA) Soil Conservation Service and the N.H. Water Resources Board were
the entities primarily involved with the design, construction and operation
of the projects. Today, the Soil Conservation Service goes by the name
of Natural Resources Conservation Service and is still part of the USDA,
while the N.H. Water Resources Board has become part of DES and is called
the N.H. Water Resources Council. The map that follows shows the
locations of the four sites.
Current Dam Safety Practices
Although DES's regulations governing the oversight of dams have changed
considerably over the years, the principle remains the same: keep dams
in New Hampshire functioning properly for the continuing safety of those
living, working, and playing downstream. All four of the flood control
reservoirs in New Ipswich are impounded by dams which are considered to
pose a threat to downstream lives and property should they fail. For this
reason they are required to have a thorough safety inspection at regular
intervals. Because Sites 14, 19, and 35 are considered to pose more of
a threat than Site 13, they are classified as "high hazard" Class C structures
and are inspected at least once every two years. Site 13 is classified
as a "significant hazard" Class B structure due to its smaller dam height
and reservoir volume, and has a detailed inspection carried out at least
once every four years.
In addition to requiring routine safety inspections at regular intervals,
DES mandates that all dams that pose a significant or high hazard potential
to downstream lives and property have an emergency action plan (EAP) prepared
for them. This plan is a compilation of information intended to facilitate
rapid and coordinated response to an imminent or actual failure of the
dam. Some of the items included in an EAP are:
Notification Flowchart - a flowchart diagram listing
the names and telephone numbers of the emergency respondents and/or affected
parties who are to make or receive calls should a situation develop at
the dam.
Preventive Action - a section in the EAP that outlines the steps
that a dam monitor or other respondent might take to address various situations
that may reasonably occur at the dam. This section should also include
a sketch of the dam, information relative to how the monitor has been trained,
and what materials may be needed to address problems.
Breach Analysis - a simulation, usually using a specialized computer
program, estimating the locations and depths of flooding along the downstream
reach of the dam.
Inundation Maps- the maps generated from the breach analysis
which show potentially inundated areas and provide emergency respondents
and inhabitants with information relative to evacuation.
Site 13
Height: 14 feet Length: 1,120 feet
Maximum Storage: 278 acre-feet
Hazard Classification: Class B (significant hazard)
Areas Susceptible to Breach Flooding: Greenville
Road (3 crossings) and the Mill Pond at Otis Falls. Any development along
the stream from the dam to the confluence with the Souhegan River, including
the short stretch of the Souhegan River to the Mill Pond at Otis
Falls may also be susceptible to flooding. |
|
By having a plan that describes the potential hazards of
a dam failure and which identifies the respondents and their roles should
such an event begin to develop, the possibility to reduce or even prevent
loss of life and property damage is increased. These plans are reviewed,
updated and tested on an annual basis to ensure that they are functional
and accurate.
In addition to the flooding that could result from a breach of these
dams, there also exists the possibility that some travel areas within the
flood storage pool upstream of the dams will become flooded. DES, in cooperation
with the N.H. Association of Conservation Districts, the N.H. Office of
Emergency Management, and the Hillsborough County Conservation District,
has erected signs along these travel routes to warn motorists that backwater
flooding may be experienced in these areas. |
Inspections, Operation and Maintenance
| Since their construction in the mid-1960s, these sites have been routinely
inspected, operated and maintained by DES. A typical detailed safety inspection
includes a field evaluation and an office review. The field evaluation
includes a complete walk-through to view all areas of the dam, inspection
of the interior of drop inlets and principal spillway pipes, and a review
of the development along the downstream reach of the dam. Deficiencies
are noted, measurements are verified and photos are taken to completely
document the inspection.
Subsequent to the field evaluation, an office review is performed. During
this segment of the inspection process, the watershed hydrology and structure
hydraulics are evaluated. Generally, unless considerable development has
occurred within the watershed which could change the amount or speed of
runoff into the reservoir or hydrological analysis techniques have evolved,
these office analyses do not result in identifying deficiencies. However,
since a dam's ability to pass storm discharges is paramount to its safe
operation, these parameters must be verified as part of every safety inspection. |
Site 14
Height: 35 feet Length: 1,500 feet
Maximum Storage: 885 acre-feet
Hazard Classification: Class C (high hazard)
Areas Susceptible to Breach Flooding: Ashley Mill
Road, Greenville Road, Tricnut Road, NH Route 124 (Old Turnpike Road),
and the Mill Pond at Otis Falls. Any development along Furnace Brook and
the Souhegan River between these road crossings/structures may also be
susceptible to flooding. |
|
| Site 19

Height: 35.5 feet Length: 1,200 feet
Maximum Storage: 2,378 acre-feet
Hazard Classification: Class C (high hazard)
Areas Susceptible to Breach Flooding: Ashby Road,
Waterloom Falls, NH Route 124 (at High Bridge), the Mill Pond at Otis Falls,
Main Street, Mill Street, Old Wilton Road and perhaps NH Route 31. Any
development along the Souhegan River between these road crossings/structures
may also be susceptible to flooding.
|
|
Manual operations at these flood control sites is rarely
needed, as their original designers built in the ability for the structures
to slowly store large volumes of storm runoff while keeping discharges
through the dam controlled. However, there will be rare instances when
water levels in the reservoirs will increase to the point where discharges
will be safely directed around one end of the dam through a specially
designed emergency spillway in a less controlled manner. This is not to
say that the dams or the people living downstream are in danger. On the
contrary, this condition is just as the designers hadin mind. When flow
begins to pass through these auxiliary spillways, it means that the reservoir's
storage capability has been used to the extent that any additional flows
coming into the reservoir will be passed more quickly through the site
- and potentially add to damaging flooding that might be occurring downstream.
|
| Site 35

Height: 30 feet Length: 1,209 feet
Maximum Storage: 1,787 acre-feet
Hazard Classification: Class C (high hazard)
Areas Susceptible to Breach Flooding: Taylor Road,
Page Hill Road, Gibson Pond, Ashby Road, River Road and Waterloom
Pond. Any development along the West Branch of the Souhegan River and the
Souhegan River between these road crossings/structures may also be susceptible
to flooding. |
|
Maintenance at the flood control sites is performed on an as-needed
basis as dictated by either the findings of a detailed safety inspection
or by periodic visits by DES maintenance staff. It is important to note that these sites are visited much
more frequently than the required inspection interval of either two or
four years. In reality, DES visits the sites bimonthly to make sure that
the sites are functioning normally, and much more frequently during times
of extreme weather. For the most part, maintenance issues include the removal
of beaver debris or other floating debris from spillways, trimming woody
vegetation or woody growth back away from the dam area, reestablishing
hearty grass cover, and dealing with items resulting from transient use
of the properties. This includes repairing vehicle ruts, foot traffic erosion,
and picking up trash.
|
For more information on these or other Souhegan River Watershed flood
control sites, please contact the N.H. Department of Environmental Services,
Water Division, Dam Bureau at (603) 271-3406.
Glossary
Dam monitor - a person familiar with the operational and maintenance
issues of a dam who is assigned to monitor a dam.
Drop inlet - a vertical structure, usually a circular or square
conduit, located on the upstream side of a dam which is used to control
discharge through a dam.
Emergency spillway - an auxiliary outlet structure designed to
pass flows greater in volume than the primary outlet structure.
Inundation map - a map delineating the area that would be inundated
or flooded during a dam failure or other defined event.
This fact sheet was prepared with grants and other assistance from the
N.H. Office of Emergency Management and the N.H. Association of Conservation
Districts.

|